Ad #7765969
MLS #196513
Brand new construction scheduled for completion Aug/Sept 2026!
742 Marlin Dr, Fripp Island, SC 29920
$1,895,000
4Beds
4Baths
3,465Sqft
0.44Acres
About this property
Brand new construction scheduled for completion Aug/Sept 2026! This 3,465 sq ft masterpiece offers the ultimate coastal lifestyle, perfectly positioned across the street from beach access and overlooking the Ocean Point golf course. Framed by beautiful mature trees, the home boasts expansive outdoor living with multiple huge front and back porches. Inside, discover a gourmet kitchen with gas cooking and upscale appliances, a private office, and an upstairs loft. All 4 bedrooms feature private ensuite bathrooms for maximum comfort. An elevator connects the levels seamlessly. High-end design meets prime location in this spectacular golf and beach retreat.
Property Features
4 Beds
4 Baths
3,465 Sqft
Built in 2026
0.44 Acres
View Type: Golf Course
Garage
Siding: Board & Batten Siding
Composition Roof
Has Fireplace
Heat Pump (Heating), Central, Electric (Heating)
Beaufort County
Fripp Island Community
Additional Photos
Contact Information
Charles Patty
Fripp Island Real Estate
843-597-1170
Location
Listing Agent: Charles Patty (License #: 38321) 843-597-1170
Broker: Fripp Island Real Estate 800-845-4100 Listing Site
Copyright © 2026 Lowcountry Regional MLS. All rights reserved. All information provided by the listing agent/broker is deemed reliable but is not guaranteed and should be independently verified.
Broker: Fripp Island Real Estate 800-845-4100 Listing Site
Copyright © 2026 Lowcountry Regional MLS. All rights reserved. All information provided by the listing agent/broker is deemed reliable but is not guaranteed and should be independently verified.
BarrierFreeHome.com
Printed Nov 10, 2026
Photo Gallery
$1,895,000
4
Beds
4
Baths
3,465
Sqft
742 Marlin Dr, Fripp Island, SC 29920
By contacting this agent you agree to these Terms and Conditions.
MLS# 196513
$1,895,000
742 Marlin Dr, Fripp Island, SC 29920
4
Beds
4
Baths
3,465
Sqft
0.44
Acres
4 Beds
4 Baths
3,465 Sqft
0.44 Acres
Accessibility Features
Accessible Elevator Installed
Brand new construction scheduled for completion Aug/Sept 2026!
Brand new construction scheduled for completion Aug/Sept 2026! This 3,465 sq ft masterpiece offers the ultimate coastal lifestyle, perfectly positioned across the street from beach access and overlooking the Ocean Point golf course. Framed by beautiful mature trees, the home boasts expansive outdoor living with multiple huge front and back porches. Inside, discover a gourmet kitchen with gas cooking and upscale appliances, a private office, and an upstairs loft. All 4 bedrooms feature private ensuite bathrooms for maximum comfort. An elevator connects the levels seamlessly. High-end design meets prime location in this spectacular golf and beach retreat.
171 days
on BarrierFreeHome.com
122
views
0
saves
Property Details
HOME DETAILS
4 Beds
4 Baths
3,465 Sqft
Built in 2026
0.44 Acres
BARRIERFREE ACCESS & VIEW
View Type: Golf Course
EXTERIOR
Garage
Siding: Board & Batten Siding
Composition Roof
INTERIOR
Has Fireplace
Heat Pump (Heating), Central, Electric (Heating)
FINANCIAL & COMMUNITY
Beaufort County
Fripp Island Community
See More Details
Location
Mortgage Calculator
Ad Statistics
Ad Number
7765969
Viewed
122 times
Listing Status
Pending
Added
May 22, 2026
Last Refreshed
Nov 10, 2026 12:43:11 AM
Listing Information
Data Source
Lowcountry Regional MLS
Source Property ID
196513
Listing Agent: Charles Patty (License #: 38321) 843-597-1170
Broker: Fripp Island Real Estate 800-845-4100 Listing Site
Copyright © 2026 Lowcountry Regional MLS. All rights reserved. All information provided by the listing agent/broker is deemed reliable but is not guaranteed and should be independently verified.
Broker: Fripp Island Real Estate 800-845-4100 Listing Site
Copyright © 2026 Lowcountry Regional MLS. All rights reserved. All information provided by the listing agent/broker is deemed reliable but is not guaranteed and should be independently verified.
Request Information
Start advertising today
Explore options for real estate agents and homeowners advertising on BarrierFreeHome.com
Sell Your Home
Explore Similar Properties